500+ Projects of Experience

The Experience That
Built One Point.

Every project on this page is part of the story that shaped our team. The people behind One Point have worked across hospitals, airports, industrial campuses, and everything in between — and that depth of experience is exactly what we bring to you.

500+
Projects Completed
$250M+
Construction Value
6
States Active
150+
Years of Experience
🏗️

The Collective Experience Behind One Point

The projects showcased here represent the breadth of experience our team carries — work completed across careers, companies, and decades before coming together under One Point. These are not projects One Point constructed under our own banner, but they are the environments, challenges, and achievements that formed our people and defined our standard. When you work with One Point, this is the depth of knowledge walking through your door.

Experience Portfolio

Environments Our Team Has Shaped

A cross-section of the large-scale industrial, logistics, and commercial environments our people have had a hand in building — experience we now bring to every One Point engagement.

Large industrial complex
Mega-Site Construction
Large-Scale Industrial Complex

Multi-phase construction of a flagship industrial development spanning several hundred acres.

Distribution facility
Industrial
High-Throughput Distribution Facility

Precision-engineered warehouse with full conveyor integration and dock-high loading systems.

Aerial Terminal Complex
Logistics Hub
Aerial Terminal Complex

End-to-end development of a critical logistics node, ground-up.

Regional Fulfillment Center
Aerial Survey
Regional Fulfillment Center

Design-build delivery of a multi-building logistics campus.

Facility Access & Canopy
Entrance Systems
Facility Access & Canopy

Structural canopy and controlled-access entry for high-traffic use.

Aviation — St. Pete-Clearwater, FL

St. Pete-Clearwater
International Airport (PIE)

Terminal expansion and infrastructure improvements at one of Florida's fastest-growing regional airports — an environment our team members have worked in firsthand, navigating the demanding operational constraints of a live, active flight facility.
St Pete Clearwater Airport terminal expansion
Terminal Expansion
$110M PIE Terminal Expansion
St Pete Clearwater Airport aerial view
Aerial Overview
Airport Campus — Full Facility View
Active Facility
Constructed inside a live operational airport
$110M+
Terminal expansion program value
Phase I–III
Phased delivery to minimize guest disruption

Aviation — Tampa, FL

Tampa International
Airport (TPA)

Airside D expansion and concourse modernization at one of the top-rated airports in North America — structural systems, MEP coordination, and complex phasing in an active aviation environment, representing the kind of work our team has navigated hands-on throughout their careers.
Tampa International Airport Airside D expansion northwest view
Airside D Expansion
TPA Northwest Elevation — New Concourse
Tampa International Airport Airside D interior
Interior
Airside D Concourse Interior
Tampa International Airport Airside D north view
North Elevation
Airside D — 30% Design Stage
Airside D
New concourse serving major domestic carriers
Active Ops
Built while TPA served millions of passengers annually
FAA Compliant
Full regulatory compliance throughout all phases

Healthcare — Cumming, GA

Peachtree Orthopedics
Surgical Center

A new 3-story, 60,000+ sq ft surgical center and medical office complex in Cumming, Georgia — one of the most advanced orthopedic facilities in the Southeast. Our team members bring direct experience from projects of this scope and complexity to every healthcare build we take on.
Peachtree Orthopedics Cumming GA surgical center grand opening
Grand Opening
Peachtree Orthopedics — Cumming Campus

New 3-story surgical center and medical office building, Cumming, Georgia.

Peachtree Orthopedics groundbreaking Cumming GA
Groundbreaking
New Complex — Start of Construction
Peachtree Orthopedics Cumming location
Facility
Cumming Campus — Delivered
3 Stories
New ground-up surgical center
60,000+
Square feet of medical space
Cumming, GA
Peach Tree Rd, Forsyth County
Sterile-Build
Surgical suite infection-control standards

Ready to Add Your Project
to This List?

The experience behind One Point has tackled projects at every scale and complexity. Now we bring all of it to your build — from first conversation to ribbon-cut.